June 18, 2018

Evektor delivers the first subassemblies to L-39NG training combat aircraft program

Evektor delivers the first subassemblies to L-39NG training combat aircraft program

The first aircraft section for the new L-39NG jet training aircraft was delivered by Evektor to L-39NG assembly line at Aero Vodochody. The delivery consisted of the nose fuselage section – the first among four sets to be delivered by Evektor in 2018. Quality inspection and acceptance of delivery was made by inspection team from Aero Vodochody at Evektor-Aerotechnik´s production facility in Kunovice. Evektor has futher under manufacturing process rear fuselage section with tail, horizontal stabilizer, rudder, elevator and air brakes for L-39NG program.

The L-39NG aircraft is a modern and effective trainer for air forces. The aircraft is a next generation of the legendary L-39 Albatros jet trainer which is operated in air forces of more than 30 countries.  The L-39NG has a redesigned airframe with reduced weight and increased service life, is powered by the new Williams FJ44-4M engine and equipped with a modern integrated digital avionics with configurable glass cockpit for the increased training effectiveness.  

Close Cookie Preference Manager
Cookie Settings
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage and assist in our marketing efforts. More info
Strictly Necessary (Always Active)
Cookies required to enable basic website functionality.
Made by Flinch 77
Oops! Something went wrong while submitting the form.